News

1/10/2026 – Córdoba CF Business Club

On 1 October, we had the pleasure of attending another Business Club meeting.

21/09/2026 – IMDECO (Fuensanta)

Supply of aluminum competition goals for the Fuensanta municipal sports facilities.

 

24/08/2026 – Córdoba CF

Supply and installation of new benches (dugouts) at the Córdoba CF Sports City.

19/08/2026 – UD Levante

upply and installation of 168 new seats for the VIP area at the Ciudad de Valencia Stadium.

 

20/07/2026 – IMDECO (I.D.M. Naranjo)

Comprehensive renovation of the El Naranjo sports facilities in Córdoba.

02/07/2026 – CD Castellón

Supply and installation of new prefabricated modules for the UCO at CD Castellón’s Castalia Stadium.

11/06/2026 – IMDECO (I.D.M. Naranjo)

Major refurbishment of the El Naranjo pitches officially opened

29/04/2026 – IMDECO (I.D.M. Naranjo)

Final stage of the refurbishment of the sports facilities.

16/04/2026 – IMDECO (I.D.M. Fuensanta)

Repair of seating areas. Structural refurbishment and replacement of the polycarbonate panels.

09/04/2026 – Ciudad Deportiva de Granada (Diputación de Granada)

Supply and installation of three electronic scoreboards.

30/01/2026 – CD Castellón

Supply and installation of 600 m² of artificial hedging at CD Castellón’s training ground.

14/01/2026 – IMDECO (I.D.M. Naranjo)

Lifting and repair of the area affected by the subsidence.

09/12/2025 – CD Leganés

Progress at the Ontime Butarque Stadium.

05/12/2025 – CD Leganés

Supply and installation of 1,248 new seats in the stands at the Ontime Butarque Stadium (CD Leganés).

22/10/2025 – Córdoba CF

Supply and installation of the new video scoreboards (9x5) at the Bahrain Victorious Nuevo Arcángel stadium.

17/10/2025 – Cabildo Insular Lanzarote

Supply and installation of new player and referee benches at Cabildo de Lanzarote facilities.

03/10/2025 – IMDECO (campo fútbol Vistalegre)

Supply and installation of RGF XM7 model artificial turf on the Vistalegre football 7 pitch (Córdoba).

01/10/2025 – CD Castellón

Supply and installation of decorative artificial turf at the new CD Castellón Sports City.

15/09/2025 – Heliodoro Rodríguez López Stadium

Supply and installation of new self-folding seats at the Heliodoro Rodríguez López Stadium, home of CD Tenerife.

02/09/2025 – IMDECO (Estadio C.D. Alcolea)

Supply and installation of next-generation artificial turf at the football field in Alcolea.

14/08/2025 – Don Bosco C.F.

Maintenance and repair of artificial turf at the headquarters of Don Bosco C.F.

09/07/2025 – Court for ACB

Supply and installation of FIBA-certified 3×3 courts at the ACB event in Valencia, as official distributors of Sportspartner in Spain.

01/07/2025 – Heliodoro Rodríguez López Stadium

Installation of support structures for new folding seats at the Heliodoro Rodríguez López Stadium.

06/06/2025 – Villaralto City Council

Supply of portable stands for the Villaralto Sports Pavilion, with a capacity for 278 people.

05/06/2025 – SCD Carolinas, Alicante

Supply and installation of an official FIBA 3×3 court at the El Patio 3×3 tournament in Alicante.

04/06/2025 – Heliodoro Rodríguez López Stadium

Start of the renovation at the Heliodoro Rodríguez López Stadium, with the removal of the current seats as a preliminary step toward installing new folding seats.

03/06/2025 – Fundación Osasuna

Supply and installation of vinyl flooring at the Municipal Pavilion of Massanassa, in collaboration with Fundación Osasuna. 

02/05/2025 – Fundación Osasuna

Replacement of turf on two paddle courts in Massanassa (Valencia), in collaboration with the Osasuna Foundation.

22/01/2025 – Real Racing Club de Santander

Supply and installation of 800 self-folding seats at El Sardinero Stadium, home of Real Racing Club de Santander.

31/12/2024 – Córdoba CF

Supply and installation of a new scoreboard at the Córdoba C.F. Sports City.

27/12/2024 – Los Llanos de Aridane City Council

Removal of artificial turf on the 7-a-side football field in Llanos de Aridane, La Palma, as the first step towards installing new turf.

18/12/2024 – Málaga CF

Installation of 1,500 folding seats at the New Sports City of Málaga CF.

10/10/2024 – África Sports Expo

Participation in the Africa Sports Expo, from October 10th to 13th in Morocco, showcasing our innovative solutions for sports facilities.

30/09/2024 – CB Ciudad de Córdoba

Sanding, preparation, and application of the Compodur and Compopaint systems on the court at the Almedina School sports hall for the Europa Ciudad de Córdoba Basketball Club.

26/09/2024 – La Salle School of Cordoba

Repair and maintenance of artificial turf at the La Salle School fields, including 400 linear meters of seams, 20 linear meters of marking lines, and the addition of silica sand and black SBR rubber.

20/09/2024 - Prince of Asturias Pavilion in Oviedo

Installation of 5,300 seats in the new stands of the Príncipe de Asturias Pavilion in Oviedo, in collaboration with Kotobuki Seating Group.

29/08/2024 – Granada CF

Supply and installation of 4 removable stands with a capacity for 2,500 people in the corners of the Nuevo Los Cármenes Stadium, home of Granada Club de Fútbol.

19/08/2024 – Córdoba CF

Supply and installation of a protective net in the moat of the Nuevo Arcángel Stadium, complying with LFP regulations for Córdoba Club de Fútbol.

14/08/2024 - Municipal Stadium Los Príncipes

Installation of 492 seats at the Municipal Stadium Los Príncipes in Palos de la Frontera, enhancing the comfort and quality of the sports facilities.

12/08/2024 - Heliodoro Rodríguez López Stadium

Official award by the Cabildo Insular of Tenerife for the replacement of seats in the stands of the Heliodoro Rodríguez López Stadium with modern self-folding seats.

03/05/2024 - Olivares City Council

Comprehensive maintenance of the 11-a-side football field in Olivares (Seville), ensuring its optimal performance and functionality. Committed to excellence in sports facilities.

22/04/2024 – Club Atlético Osasuna

Start of the artificial turf removal in four fields at the Tajonar Sports City, in collaboration with Fieldturf Poligras and C.A. Osasuna.

15/04/2024 - Castro del Río Town Council

Maintenance completed on the 11-a-side football field in Castro del Río, ensuring a playing surface in optimal condition for maximum player performance.

25/03/2024 – La Salle School of Cordoba

Supply and installation of seats in the second phase of the sports hall at La Salle School in Córdoba, enhancing the comfort and functionality of its sports facilities.

21/03/2024 – IMDECO (⁠IDM Fátima)

Maintenance completed on the paddle courts at IDM Fátima, including decompaction and brushing of the turf on four courts to ensure optimal playing conditions.

06/03/2024 – Club Atlético Osasuna

Renovation of the locker room tunnel at El Sadar Stadium for C.A. Osasuna, including rubber flooring and wall paneling as per the approved design.

27/02/2024 – ⁠⁠IMDECO (IDM Guadalquivir)

Maintenance completed on the 7-a-side football field at the IMDECO sports facilities in Guadalquivir, Córdoba.

12/02/2024 – Club Atlético Osasuna

Supply and installation of hybrid turf at the Tajonar Sports City in collaboration with C.A. Osasuna, highlighting our commitment to innovation and excellence in sports infrastructure.